| Project Details |
|
Buwer Ahmad Steel Co.
Start Date:
1382/05
End Date:
1382/10
Taskmaster:
Buwer Sanat Co./B.S Technik GmbH.
Description:
BankableFeasibility Report to establish a Steel Making Plant with The capacity of 120,000 TPY. Billet With 2x12 ton IMF. & CCM. with 2/3 Strand. from HBI.& Scrap
Scope of service : -Technical report including conceptual designe,technology evaluation and selection,Major Equipmet list, Utility consumption,Material Balace,....
- Bankable Financial Report including : IRR.,Cash-Flow, Balance Sheet,B.E.P,Sensivity analysis,..
|