Sunday , 5 September 2010
Project Details

Buwer Ahmad Steel Co.
Start Date: 1382/05
End Date: 1382/10
Taskmaster: Buwer Sanat Co./B.S Technik GmbH.


Description:


 BankableFeasibility Report to establish a Steel Making Plant with The capacity of 120,000 TPY. Billet With 2x12 ton IMF. & CCM. with 2/3 Strand. from HBI.& Scrap 

Scope of service :
-
Technical report including conceptual designe,technology evaluation and selection,Major Equipmet list, Utility consumption,Material Balace,....

-  Bankable Financial Report including : IRR.,Cash-Flow, Balance Sheet,B.E.P,Sensivity analysis,..


  
Copyright © 1999 - 2008 Agahan Corporation, All rights reserved.
Design By: Parsian Mehr